• Mon - Sat: 8:00 - 18:00
  • contact@panaceagroup.ca
  • Fort Hills Oil Sands Project
    The Fort Hills oil sands mining project is located in Alberta’s Athabasca region, 90 kilometres north of Fort McMurray, Alberta and is recognized as one of the best undeveloped oil sands mining assets in the region.

    The project is operated by Suncor, and is scheduled to produce first oil as early as the fourth quarter of 2017 and achieve 90% of its planned production capacity of 180,000 barrels per day within 12 months. The mine life is expected to be approximately 50 years at the current planned production rate.

    Our engineers have designed a vast portion of the Fort Hills project and have provided their technical expertise to make the project successful. The following services were provided for the entire Fort Hills Extraction & Tailings Plant and the entire Fort Hills Ore Preparation Plant:

    • Hazardous Area Classification Studies
    • Soil Resistivity Test Analysis (using CDEGS)
    • Grounding Studies (using CDEGS and SKM GroundMat)
    • Power Studies (using ETAP and SKM PowerTools)
    Project Co-Owners:
    • Suncor Energy Inc.
    • Total E&P Canada Ltd.
    • Teck Resources Limited